SUN 01 NOV, 05:29
/am/clients/ps-268/brief/j-0142 · draft

Design brief.

Five sections. A–J live inside them. C, D, and F are blockers — if those are open the brief does not go to the PM, and the PM is who assigns the designer.

AUTOSAVED · LEAVE ANY TIME
2 / 5 COMPLETE
Step 3 · Deadline
PS 268 · J-0142
When must the designer deliver?
The date the designer owes the file. Install week is a proposal the PM books — do not put it here.
Designer delivery, not install. Tie the date to why the designer must hit it.
Brief so far
Gate: five sections filled, and every C, D, and F line attested. Anything else can be unknown if you write N/A. The PM structures this and routes a designer.