/am/briefs · the handoff artifacts
Briefs. Every brief across the book and who is holding it. A draft nobody finished blocks its job silently, so unfinished ones sort to the top.
Start a brief
All briefs Unfinished first · then by age
Group: status Group: account Flat
✎ Needs finishing4
4d PS 268 · auditorium wrap J-0142 Started 22 Aug. Deadline and requirements still open. 2/5 ! Stalled 4d▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes 4d PS 268 · corridor panels J-0157 Not started. The job is in design without one. 0/5 ! Stalled 4d▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes 9d Riverdale Prep · lobby rebrand J-0146 Scope only. Nobody has touched it since 17 Aug. 1/5 ! Stalled 9d▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes 11d Tottenville HS · solar shades J-0161 One section short. Production notes never written. 4/5 ⏸ Hold▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes ▸ With the PM2
3d IS 211 · logo blinds J-0149 With the PM since 23 Aug. Not structured yet. 5/5 ▸ With the PM▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes 1d JHS 118 · shade repair J-0155 Submitted yesterday. PM notified. 5/5 ▸ With the PM▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes ✓ Structured2
6d PS 115 · cafeteria print J-0152 Structured 20 Aug · designer routed. 5/5 ✓ Structured▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes 8d Soundview Plaza · fascia + wraps J-0158 Structured 18 Aug · in production. 5/5 ✓ Structured▼ 01 Scope 02 Timing 03 Deadline 04 Requirements 05 Production notes A stalled draft is now a Today row. Three days in draft with no Hold reason lands on Today. Hold is a flag with a restart date, not a stage. Submit still goes to the PM.